B2BEA.org Rebuild build-execution S-52
internal prototype · canonical JSON + Dreamborn Forge HTML
internal generated
build-execution · supabase_json

B2BEA.org Rebuild build-execution S-52

build-execution artifact · for B2BEA.org Rebuild · phase S-52 · status complete

Planning Surface

Use this to decide what happens next.

Status

complete

Phase

S-52

Next Action

Start Slice 53 from origin/main; rescan remaining inline scripts and classify data/config/schema scripts versus remaining behavior.

completed
  • Moved the large vendor portal inline runtime from src/vendor-portal/index.njk into /assets/js/vendor-portal-runtime.js.
  • Preserved existing runtime behavior, including vendor profile edits, content submissions, Sanity fetches, analytics, tab lazy-loading, and welcome banner handling.
  • Registered /assets/js/vendor-portal-runtime.js in CSS governance legacy inline-style allowlist because the moved runtime preserves existing generated inline style strings.
  • Added focused vendor portal runtime governance coverage.
verification
  • Red test first: node --test test/vendorPortalRuntime.test.js failed before /assets/js/vendor-portal-runtime.js was wired.
  • node --check src/assets/js/vendor-portal-runtime.js: passed
  • node --test test/vendorPortalRuntime.test.js: 1/1 passed
  • node scripts/audit-css-governance.js: passed after legacy inline-style allowlist registration
  • git diff --check: passed
  • npm test: 116/116 passed
  • npm run build: Eleventy copied 124 assets and wrote 126 files
  • GitHub Actions build: passed in 16s
  • Cloudflare Pages: passed
branch

feature/b2bea-slice-52-vendor-portal-runtime

pull request

https://github.com/b2bea-org/b2bea-website/pull/87

next action

Start Slice 53 from origin/main; rescan remaining inline scripts and classify data/config/schema scripts versus remaining behavior.

Agent Handoff
Start Here

Start Slice 53 from origin/main; rescan remaining inline scripts and classify data/config/schema scripts versus remaining behavior.

Completion Evidence
  • Red test first: node --test test/vendorPortalRuntime.test.js failed before /assets/js/vendor-portal-runtime.js was wired.
  • node --check src/assets/js/vendor-portal-runtime.js: passed
  • node --test test/vendorPortalRuntime.test.js: 1/1 passed
  • node scripts/audit-css-governance.js: passed after legacy inline-style allowlist registration
  • git diff --check: passed
  • npm test: 116/116 passed
  • npm run build: Eleventy copied 124 assets and wrote 126 files
  • GitHub Actions build: passed in 16s
  • Cloudflare Pages: passed
Completed
  • Moved the large vendor portal inline runtime from src/vendor-portal/index.njk into /assets/js/vendor-portal-runtime.js.
  • Preserved existing runtime behavior, including vendor profile edits, content submissions, Sanity fetches, analytics, tab lazy-loading, and welcome banner handling.
  • Registered /assets/js/vendor-portal-runtime.js in CSS governance legacy inline-style allowlist because the moved runtime preserves existing generated inline style strings.
  • Added focused vendor portal runtime governance coverage.
Next Action

Start Slice 53 from origin/main; rescan remaining inline scripts and classify data/config/schema scripts versus remaining behavior.

Structured Payload

Machine-readable source fields

kind

build-execution

branch

feature/b2bea-slice-52-vendor-portal-runtime

project

b2bea-website

phase id

S-52

worktree

/Users/justinking/Vaults/Projects/B2BEA-org-new/.worktrees/b2bea-slice-52-vendor-portal-runtime

completed
  • Moved the large vendor portal inline runtime from src/vendor-portal/index.njk into /assets/js/vendor-portal-runtime.js.
  • Preserved existing runtime behavior, including vendor profile edits, content submissions, Sanity fetches, analytics, tab lazy-loading, and welcome banner handling.
  • Registered /assets/js/vendor-portal-runtime.js in CSS governance legacy inline-style allowlist because the moved runtime preserves existing generated inline style strings.
  • Added focused vendor portal runtime governance coverage.
merged at

2026-05-09T19:53:50Z

base branch

main

head commit

888a4f7

next action

Start Slice 53 from origin/main; rescan remaining inline scripts and classify data/config/schema scripts versus remaining behavior.

merge commit

b23359b85c13dce73c1db4702be2f3a8e1b53c58

pull request

https://github.com/b2bea-org/b2bea-website/pull/87

verification
  • Red test first: node --test test/vendorPortalRuntime.test.js failed before /assets/js/vendor-portal-runtime.js was wired.
  • node --check src/assets/js/vendor-portal-runtime.js: passed
  • node --test test/vendorPortalRuntime.test.js: 1/1 passed
  • node scripts/audit-css-governance.js: passed after legacy inline-style allowlist registration
  • git diff --check: passed
  • npm test: 116/116 passed
  • npm run build: Eleventy copied 124 assets and wrote 126 files
  • GitHub Actions build: passed in 16s
  • Cloudflare Pages: passed
checkpoint at

2026-05-09T19:54:18.798Z